IPPRA / Grant Monitor

2026-09-06
← Board

Groundwater and Surficial Water Salinity Changes in Everglades National Park using Aerial Electromagnetic Surveys

W9126G262SOI0520 · Fort Worth District

environment water resources climate weather agriculture food Science & Technology R&D

Closes
2026-10-06 · 30 d
Award ceiling
$1,657,690
Award floor
$300,000
Program funding
Expected awards
1
Cost sharing
No
Posted
2026-09-04
Instrument
Cooperative Agreement
Characterization · gpt-5.4-mini · 2026-09-05

This cooperative agreement funds a CESU partner to conduct aerial electromagnetic surveys and related analysis of groundwater and surface-water salinity changes in Everglades National Park for USACE restoration management decisions.

Funds
applied research
University
partner only
physical sciences
substantial
engineering
substantial
life biomedical
minor
computational data
substantial

⚑ Eligible only for Cooperative Ecosystem Study Units in the Gulf Coast, Piedmont-South Atlantic Coast, and South Florida Caribbean regions · SOI only at this stage; complete proposal and budget are not requested now · 30-day Grants.gov posting requirement before full proposal request · Maximum 17.5% indirect cost rate applies

12 / 100 IPPRA team judgment

This is a geophysical/salinity survey and restoration-management project centered on aerial electromagnetic methods and coastal hydrology, which is outside IPPRA’s social-behavioral, survey, policy, and risk-communication lines. The team might contribute tangentially only if there were a public-risk or stakeholder-acceptance component, but none is evident here.

JUDGED AGAINST THE ROSTER'S PUBLICATION DOSSIER · GPT-5.4-MINI · 2026-09-05

Unit fits — one characterization, each unit's own rules

Physical Sciences & Engineering (demo) 55 good technical depth: substantial; funds applied research
IPPRA 45 partial portfolio topics: environment, water_resources, climate_weather (primary); social/behavioral work is none; funds applied research; university can only partner, not lead; capped at 45 (limited social-science role)
Tom Love Innovation Hub 25 weak funds applied research; deep-tech content

Description

NOTE: A complete study proposal and proposed budget are not requested at this time.

NOTE: The established CESU indirect rate is 17.5%. For any Cooperative Agreement entered into in response to this RSOI, a maximum 17.5% indirect cost rate will be paid on work covered by such agreement or any modifications thereto. Unless the agreement specifies otherwise, the basis of direct costs against which the agreement’s indirect cost rate is applied must be either the same base identified in the recipient's federally negotiated indirect cost rate agreement or, if the recipient does not have a federally negotiated indirect cost rate agreement, the Modified Total Direct Cost (MTDC) base.

TITLE OF PROJECT: Groundwater and Surficial Water Salinity Changes in Everglades National Park using Aerial Electromagnetic Surveys

SYNOPSIS OF PROJECT: This project will support the U.S. Army Corps of Engineers (USACE) Jacksonville District by performing Aerial Electromagnetic (AEM) surveys to understand the current spatial extent and rate of saltwater intrusion in the ground and surface waters of the southern Florida Everglades. Results will be integrated with previous survey data conducted over the last 30 years to comprehend the impacts surrounding significant critical habitat loss. Future freshwater-saltwater interface trends will then be estimated to optimize management decisions tied to restoration efforts of the degraded wetland system.

PERIOD OF PERFORMANCE : The Base Period of the agreement will extend 12 months from date of award. Four 12-month Follow-on Periods are anticipated based on availability of funding.

SUBMISSION OF STATEMENT OF INTEREST

• Statements of Interest (SOI) are due by Noon Central Time, 06 October 2026 via email to the parties listed below.

• Direct questions no later than Noon Central Time, 14 September 2026 via email to the parties listed below.

Cheryl R. Vendemia

Grants Specialist

USACE Fort Worth District

Email: Cheryl.R.Vendemia@usace.army.mil

and

Nicole Baker

Project Manager

USACE Fort Worth District

Email: Nicole.D.Baker@usace.army.mil

Timeline for Review of Statements of Interest: RSOIs are required to be posted on www.Grants.gov for 30 days prior to the Government making a decision and requesting full proposals.

Refer to RSOI Package for complete details. Award is anticipated in Fiscal Year 2027.

Eligibility

This funding opportunity is ONLY available for Cooperative Ecosystem Study Units under the Gulf Coast, Piedmont-South Atlantic Coast, and South Florida Caribbean Regions.

Apply

View on Grants.gov → CONTACT: Cheryl Vendemia Grantor <cheryl.r.vendemia@usace.army.mil>

Proposal brief SEE AN EXAMPLE →

A one-page internal memo: fit assessment, submission requirements, document scaffold, and next steps dated back from the deadline — tailored to your project idea if you add one.

ONE LLM CALL (~1¢) · CACHED · REQUIRES STAFF KEY

Proposal shell · Department of Defense (BAA-style) conventions SEE A DOD EXAMPLE →

Funder-faithful document skeletons — Department of Defense (BAA-style)'s document set with section headings, page limits, reviewer guidance, and writing prompts; add a project idea to get [DRAFT] starter bullets. Download as .md for Word or Overleaf.

ONE LLM CALL (~2-3¢) · CACHED · SCAFFOLDING, NOT GHOSTWRITING